Our technicians can provide internal and external pathway systems. This includes the use of J-hook and cable tray pathways, schedule 40, and EMT conduit systems for low voltage wiring as well as external conduit systems.
Our Engineering and Design teams can customize new and existing underground pathways between two buildings or an entire Campus environment. This includes but is not limited to Horizontal Directional Boring and Trenching techniques used to install HDPE conduit systems underground. We also install manhole and hand hole vault systems and new Building Entry Points where required.
Our technicians are certified in the installation of indoor and outdoor fiber optic cabling infrastructures. We use the latest fusion splicing technology to terminate or repair single mode and multimode fiber optic cabling. Whether your need is an internal data closet feed cable or a cable that travels miles between buildings we are here to help.
At All About Networks we feel the copper and fiber optic cabling that is installed in your business should be installed by those that specialize in this type of work. We install copper cabling for wired and wireless data, legacy and VOIP Telephony and Paging Systems, ICM, Access Control, CCTV and much more. If you have a need to retrofit your current office or are planning to move into a new space, we can take care of the low voltage wiring required for most technical systems.
Our Engineering and Design teams can create the right network foundation to support your current requirements with a focus on the future. Today's network needs to be able to support the next generation of technologies. Our team understands the trends, emerging technologies and future roadmaps and we are able to assist in making your investment work for you.
Upon completion of our copper and fiber optic infrastructure installations our technicians will test and certify each cable with the latest Fluke Time Domain Reflectometer & Optical Time Domain Reflectometer analyzers. This test gear not only verifies that wiring has been installed and terminated correctly but also that it meets today’s performance standards for certification in TIA-568B and ISO 11801:2002 requirements. Results can be stored, saved and published for IT personnel upon completion of a project.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.